SSW500030A - Discovery 2 Rear ABS Brake Sensor - Long Lead With Loose Wires | Autotec

SKU:
SSW500030A
Brand:
Autotec
Condition:
New
Availability:
ALLOW 1-2 DAYS EXTRA SUBJECT TO AVAILABILITY
Weight:
0.23 KGS
£23.69 Inc. VAT
£19.74 Ex. VAT

Description

Discovery 2 rear ABS brake sensor - long lead with loose wires.

SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2 L318, 1998-2004

EQUIVALENT TO LAND ROVER PART NUMBER(S): SSW500030

NOTE: With ABS

PLACEMENT: Rear

ABS sensors are very sensitive, individually monitoring the speed of each wheel through an electromagnetic field generated by the wheel’s rotation. These speed signals are sent to your Land Rover's ECU to control traction and braking by applying the brakes to one or more wheels automatically keeping you and those around you safe. However, due to their closeness to the wheels and the ground, ABS sensors are exposed to constant heat, dirt and moisture, vibrations, and the occasional jolt, leading to malfunctions.

View AllClose

Warranty Information

24 MONTHS - This product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View AllClose

Additional Information

Related Part Numbers:
SSW500030
Position:
Rear
Compatible Vehicles:
Discovery 2
View AllClose

Reviews

View AllClose

Please check or contact us for help or further information if you are unsure of the compatibility with your vehicle. Also, please be aware that if you return items, we may deduct or charge you any delivery costs we have incurred and a restocking fee of up to 15% of the net price of the item(s). Photos are for illustrative purposes only. Brands, colours or quantities may vary.

Have a question or feedback about this product?