SSW500020A - Discovery 2 Front ABS Brake Sensor - Long Lead With Loose Wires | Autotec
- SKU:
- SSW500020A
- Brand:
- Autotec
- Condition:
- New
- Availability:
- ALLOW 2-3 DAYS EXTRA SUBJECT TO AVAILABILITY
- Weight:
- 0.15 KGS
Description
Discovery 2 front ABS brake sensor - long lead with loose wires.
SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2 L318, 1998-2004
EQUIVALENT TO LAND ROVER PART NUMBER(S): SSW500020
NOTE: With ABS
PLACEMENT: Front
ABS sensors are very sensitive, individually monitoring the speed of each wheel through an electromagnetic field generated by the wheel’s rotation. These speed signals are sent to your Land Rover's ECU to control traction and braking by applying the brakes to one or more wheels automatically keeping you and those around you safe. However, due to their closeness to the wheels and the ground, ABS sensors are exposed to constant heat, dirt and moisture, vibrations, and the occasional jolt, leading to malfunctions.
Warranty Information
Additional Information
Compatible Vehicles: |
Discovery 2 L318 |
Placement: |
Front |
EQUIVALENT TO PART NUMBERS: |
SSW500020 |
Please check or contact us for help or further information if you are unsure of the compatibility with your vehicle. Also, please be aware that if you return items, we may deduct or charge you any delivery costs we have incurred and a restocking fee of up to 15% of the net price of the item(s). Photos are for illustrative purposes only. Brands, colours or quantities may vary.
Have a question or feedback about this product?