Discovery 2 Rear Wheel Bearing Hub With Long Lead ABS Sensor
- SKU:
- TAY100050L
- UPC:
- 5056342718658
- Brand:
- Britpart
- Condition:
- New
- Availability:
- ALLOW 1-2 DAYS EXTRA SUBJECT TO AVAILABILITY
- Weight:
- 5.80 KGS
Description
Replacement rear wheel hub bearing assembly complete with ABS sensor with extra long lead.
Land Rover recognised that on some Discovery 2 vehicles the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with this type of ABS sensor and lead.
(ABS SENSOR LEAD DOES NOT COME WITH PLUG, PLUG FROM OLD SENSOR NEEDS SOLDERING ON TO THE NEW LEAD)
A quality replacement part, equivalent to Land Rover part number TAY100050
Suitable for the following models:
Land Rover: Discovery 2, All models, 1998-2004, REAR
Warranty Information
Please check or contact us for help or further information if you are unsure of the compatibility with your vehicle. Also, please be aware that if you return items, we may deduct or charge you any delivery costs we have incurred and a restocking fee of up to 15% of the net price of the item(s). Photos are for illustrative purposes only. Brands, colours or quantities may vary.
Have a question or feedback about this product?